Palm Jumeirah Residence
Full material package for a 1,150 m² beach villa: engineered oak herringbone, book-matched marble and slim-frame glazing.
A selection of delivered packages across villas, residential towers, commercial floors, F&B and hospitality — each supplied against a confirmed window.
Private residences delivered as complete material packages — from floor to fixture.
Full material package for a 1,150 m² beach villa: engineered oak herringbone, book-matched marble and slim-frame glazing.
Kitchen, wardrobes and joinery package manufactured to interior designer drawings, delivered in two phases.
Stone terraces, travertine interiors and outdoor teak furniture for a coastal family home.
Tower and block fit-outs where programme certainty matters more than anything.
48 apartments fitted out with parquet flooring, internal doors and cabinetry under a single delivery programme.
120 units supplied with kitchens and wardrobes; production split across two factories to hold the programme.
Common-area stone, lobby furniture and apartment glazing coordinated with the main contractor.
Offices, retail and light-industrial spaces fitted out around tenant programmes.
Workspace joinery, acoustic partitions and floor finishes delivered across three office floors.
Store fit-out package: stone feature walls, custom display joinery and lighting-ready ceiling rafts.
Cladding, mezzanine systems and heavy-duty flooring for a combined showroom and logistics facility.
Restaurants, cafés and lounges built to design intent and opening dates.
Restaurant shell to service: terrazzo bar, banquette seating and acoustic ceiling baffles matched to the design intent.
Repeatable fit-out kit across four sites: counters, seating and signage manufactured as one package.
Weather-rated outdoor furniture, decking and lighting poles for a rooftop hospitality concept.
Guestroom and public-area packages delivered in live-operating phases.
Guestroom casegoods, lobby stone and corridor wall panelling for a 64-key boutique property.
Phased refurbishment of 120 keys: furniture, cabinetry and bathroom stone replaced without closing the resort.
Lobby feature staircase, reception desk and lounge collection delivered against a handover deadline.